Take-off day
Livelo
July 13, 2017
Today was D-day: we were finally flying to Hong-Kong! At 8am, we had a last workshop at EPFL, to practice our pitching skills, and learn more about the schedule of [...]
Keep up with news from the community
Today was D-day: we were finally flying to Hong-Kong! At 8am, we had a last workshop at EPFL, to practice our pitching skills, and learn more about the schedule of [...]
Hello everyone ! After several months of research, creation, coding, welding and so on, we were able to advance our project. So, we are ready for the big start in [...]
We prepared, planned, and now it’s here. Although not yet, as us girls leave a little bit before (thanks EPFL for the flexible plane dates!) to stretch out our sore [...]
For several weeks, the waterproofing of our device was a big problem. The last test in the Hydraulic Machines Lab (HML) was not successful at all and we made our PCB [...]
Hi dear Chic Community, Since exam week is taking an end we can focus 100 % on our Peggy again 🙂 Milestone 3 on the 13th of June has once [...]
Hello there, The project is advancing and we can see our ShuQi become more and more tangible. For the milestone we had a fast and simple 3d print, but this [...]
Hi everybody, We are working hard on the connectivity between the telephone and the sensor, the first iteration of the PCB and also on the first prototype for the general [...]
After this little break, it was time to keep you informed of what has happened in recent weeks. To begin with, last week, we had the third and last milestone [...]
Today is a good day, because our PCB has arrived! Axel has worked diligently to order it as soon as possible, in order to proceed with the tests. ShuQi is [...]
Hi there :-) In a little bit more than one week milestone 3 is coming up. One of the main goals is to present some first complex interdisciplinary processes as [...]
Hello everyone! Here we are after the third milestone of last Friday. It was the last one before the trip to China and we now really feel like the departure [...]
Dear all, During week 14, we managed to finish the PCB design of our device, and we are producing it in this week. We also did the product design according [...]
Hi there :-) Last Wednesday we had our Milestone 2 presentation. This time we managed to finish your explanations in the given 15 min. to 20 min. time frame. Once [...]
Hi everyone, Short post today, just to let you know how much we've done since last post and how we're getting ready for the final milestone before heading to China! Rihab [...]
Hello everyone! Our join work ShuQi is showing tangible results - every day there are improvements in the technical and design fields. Loic has created the 3D Model of our [...]
Last night, we finally assembled the first prototype of Ilanga’s electronics. I was a little bit worried as it was only my second time doing this, but my friend Salah [...]
The engineers proudly presented with a real size 3D print of the PCB. It is an oval form which fits perfectly into the case of our lovely bird.With this mock-up we discussed [...]
At the end of this week, we finally managed to implement the most important functionalities of our microcontroller, which was a huge relief! Now we are able to automatically log [...]
After the second milestone meeting, we received some valuable suggestions from our instructors. Our next steps will be: Focus on the industrial design; BlueTooth communication between the device and the [...]
This week we have finally (and fortunately) met M. Farhat, a fluid mechanics teacher at EPFL. It turned out that EPFL has many high-end facilities allowing to simulate high pressurized [...]
The good days are FINALLY back and I feel that it gives energy to the whole team seen the advances of these last days. Khalil realized a real marathon to [...]
Today marks a big milestone for Ilanga: we ordered our first PCB! This may not sound like much, but for us it was quite stressful: once a board is made, [...]
Hello everyone ! Nice logo isn't it? After long discussions and iterations, Erika our designer created this logo so we can use it from now on to communicate on our [...]
Hi dear CHIC community Last week we booked our flights to China. Therefore, there was an exuberant atmosphere as the trip finally got concrete. Obviously, we had a lot more [...]
Hello! This week we have started working on our first prototype. We’ve finished the last tests of feasibility and the result are mostly positive. We have already explained in this [...]
Last week, we made breakthroughs in UI and Software coordination. Our Software Engineer Khalil, UI designer Hélène and Business Manager Luca sat down to settle on the app’s format. They [...]
Hello people ! As said in the title of this post, we need to post on a more regular basis. We'll work on it we promise ! So, what's new [...]
All the components have arrived and also the produced PCB is ready... What does that mean? Start soldering! With a little instruction from our super-assistant Gilbert, Tobia spent the morning [...]
In the last weeks the whole team brainstormed in order to find a name for our product that could represent it and at the same time represent the team's [...]
After a well earned week of relax (at least on paper) and a lot of eating (easter bunnies and co.), our team is back to work. Each one of us is [...]
We just named our baby ! We went for something pretty self-explanatory but also playful: Todoo ! We chose blue because it symbolizes autism and red to represent the time-timer. Once [...]
Last week we presented our 2nd milestone with the new brand identity. Proud of the improvement we have done to our lovely ShuQi, we completely changed the structure of the [...]
Hi everyone! Last Friday Milestone 2 took place and we came up with a name and two big changes. We wanted a brand related to the sun. We also wanted [...]
Hello everybody, Last week we all benefited from our Easter holidays!!! Therefore, we could allocate even more time to our project… (or at least we tried ;-)). All [...]
Hey everyone We are back after a long time of silence The second milestone is approaching and we spent the week preparing it. After the holidays we came up with [...]
The Easter celebrations are over and it’s time to get back to work. Two weeks ago (here), we faced several questions as to the turn of the continuation of our [...]
Hi everyone, This last week before the Easter break, we are very motivated because our project begins to take shape. Our software engineer finished coding the core functionalities of the [...]
On our journey, we have found a new team member: ShuQi. She has already been an observer last week, and joined us this Friday. The ingredients were a plate of [...]
The past two weeks were essentially dedicated to the electronic part of the device. The first version of the PCB has been designed and its production was launched. We hope we [...]
Hey everyone! After the success of the Milestone 1, we can continue the project. Now we are organizing the second milestone. We will present the 3D model with the electronic [...]