Aimo

The first connected mailbox lock that will turn your traditional mailbox into a safe and shared deposit box!

image

Unlock a new way of sharing

Aimo will allow you to open your mailbox using your smartphone, thanks to a virtual key. No need for a physical key anymore! And the plus? You will be able to share those keys with your friends, family and neighbors without needing their presence!

Locked and shared

Ever wanted to share a book with someone but couldn’t meet? Or felt unsecure to leave a key in the mailbox? No worries…

image

No more physical key

Open your mailbox with one push, with your phone in your pocket, thanks to bluetooth.

Guaranteed security

The lock is made of steel and designed to be unbreakable with common tools.

Share keys with your entourage

Send personalized email invitations to access your mailbox through the mobile application.

Connected

Aimo works with a mobile application that the user can download for free.

Open your mailbox automagically

Through the Aimo application, you will be able to manage and share your virtual keys, on which you can set an expiration date. And don’t worry, you won’t need to open the application every time you want to open your mailbox. Just keep your smartphone in your pocket!

Application render

Team members


I am design student and I have been passionate about the shapes of every objects around me since I was a child. I also love nature, good food and sliding sports such as snowboard and surf. I'm very curious and open minded. I think that Chic will be a great opportunity for me to work in a team with so many different skills.
Profile picture of Jean-Baptiste Bruyère
  • Jean-Baptiste Bruyère

  • Industrial Design
  • ECAL
I am a student in Media & Interaction Design at ECAL, Lausanne. Since childhood I always have the habit of analyzing our everyday objects. After a multimedia designer apprenticeship, it was natural for me to continue my journey to develop and combine my competences in the fields of art, graphic design and multimedia. Today, my research are mainly directed to the contribution of technological and artistic methods in our daily life.
Profile picture of Lara Defayes
  • Lara Defayes

  • User Experience
  • ECAL
I completed my Bachelor of Management at HEC Lausanne and am currently doing my Master in Information Systems at HEC Lausanne. I like new challenges and working together with people having different backgrounds. The CHIC experience will allow us to create something new and great as well as taking advantage of the different competences and skills brought by the different members of the team. In the past I have worked at Credit Suisse in a team of regional IT project managers and have learned a lot there about collaboration between people working in different fields. I my free time I love to listen to and play music.
Profile picture of Sara Baracchini
  • Sara Baracchini

  • Business
  • UNIL
I am passionate about robotics and innovation since my childhood. Freelance and self-learning, I'm curious and I always give priority to action over reflection. This allowed me to take part of several big projects and work for one of the most advanced startup in robotics. I think CHIC is the best opportunity for me to take advantage of my past experiences and already acquired knowledge of connected devices and entrepreneurship on a unique project to carry out from design and prototyping to manufacturing, and all this within a stimulating team involving six people with different training and background.
Profile picture of Alexis Duburcq
  • Alexis Duburcq

  • Mechanical Engineering
  • EPFL
I graduated from EPFL with a Bachelor’s degree in Computer Sciences. In parallel of my studies, I had the chance to work for several startups. I love the spirit emerging from those places filled of creativity and skills. To me, CHIC is a great opportunity to work on a practical project in team where each member brings his own field of expertise. I must admit that I am really eager to see where this adventure will lead us!
Profile picture of Jonathan Link
  • Jonathan Link

  • Software Engineering
  • EPFL
I have a bachelor degree in Electronics Engineering from Polytechnica University of Bucharest, Romania and I am currently doing a masters in robotics and space technology. I am extremely happy to help my team to built a reliable product for CHIC with my expertise in electronics engineering. During my university years, I had worked on several projects with European Space Agency and NASA, and I did an internship at CERN. Back in Romania, I was invited to several TEDx talks. As hobbies, I love to take pictures of planes and to read books regarding personal and team development.
Profile picture of Sorina Lupu
  • Sorina Lupu

  • Electronic Engineering
  • EPFL

Contact us

Our blog


The end!

August 5, 2016

Hello everyone! This trip has now come to an end, and let's look at what we have done during the last days! Well, during our last (full) day in Shenzhen,… [...]

Read more

Last day of hard work in China!

July 27, 2016

This trip comes to its end! But even the day before leaving China, there is always time to work! So today, the whole team together, we went to the new… [...]

Read more

Wrap-up of the last few days

July 27, 2016

Hello everyone! First of all, sorry for not posting in the last few days (I know you missed us), but we have been very busy! So, since last Thursday what… [...]

Read more

Day 8 – Let there be light!

July 27, 2016

After a delicious breakfast, all the 4 teams met in the lobby of the hotel to discuss with our supervisors the next steps of the projects. We decided to start… [...]

Read more

Huawei, StarPrototype and SSIP

July 25, 2016

First visit of the day, Huawei. We met at the lobby at 7:30 to take the bus to the Huawei manufacture. There, we have been welcomed in a fancy meeting… [...]

Read more

Day 4 – HKSTP and a view!

July 25, 2016

All teams worked hard last night (or early in the morning) to prepare the pitching session of the day, this one for investors-oriented people at the Science & Technology Park.… [...]

Read more

A day full of activities

July 21, 2016

Good afternoon people! What have we been up to today? Well, a bunch of things actually! Lara and I started the day in a pretty stressful way since we had… [...]

Read more

Getting closer to a functioning prototype

July 20, 2016

Hello again ! Twice in one day, how lucky are you? So today we also split up the team, in 2 groups. Sorina and Link went to Seeed Studio to… [...]

Read more

More information about the Chinese market

July 20, 2016

I have been walking around Shenzhen (well mostly around the hotel) in order to observe the behavior of the Chinese people regarding mailboxes and other topics related to our project.… [...]

Read more

2nd day at Seeed Studio

July 19, 2016

First of all, today was Lara’s birthday so it was gonna be a good day anyway!!! What a busy day! The team actually split up to do some different things… [...]

Read more

We are in CHINA!

July 18, 2016

Hello everyone! We have arrived almost one week ago in China, already! We landed in Hong Kong last Tuesday night and have already done so much! It’s time for you… [...]

Read more

Sprint UI/UX

June 10, 2016

During this sprint I implemented the design made by Lara Defayes, the media and interaction designer of the team. As you can see the UI design has rather well evolved. [caption… [...]

Read more

About electronics…

May 7, 2016

Drumroll.... Our Aimo connected device starts to take shape in terms of electronics as well. We designed the first testing board using Altium Designer and we sent it to fabrication… [...]

Read more

Milestone 2 behind!

May 1, 2016

Time is passing by so fast! Only one milestone left before we go to China! Let's look at what has been done on the business side during the last month.… [...]

Read more

Let’s talk software and firmware

April 25, 2016

This awesome adventure is the opportunity for me to update my mobile app skills. A lot of new things have appeared and among them: Swift. The brand new language from Apple… [...]

Read more

A word from our user experience designer

April 19, 2016

Here comes the time to design the communication around Aimo. But before we begin, why Aimo? What does this name even mean? Our name comes from a french saint called… [...]

Read more

Here we are!

April 7, 2016

After this long period of silence, I'm glad to announce you that the new version of Aimo is ready and the 3D printing is on-going ! The previous one helped… [...]

Read more

Milestone 1 behind!

March 29, 2016

We hope everyone had a great Easter! We are happy to have survived the first milestone! For this step, which took place last Friday, we basically needed to present in… [...]

Read more

From the industrial designer point of view

March 23, 2016

How do I design a connected mailbox locker? First of all, I need to understand perfectly the aim of the object that I want to design. This is really important!… [...]

Read more

Engineering, prototyping, components…

March 16, 2016

In parallel with mechanics, our engineering team is also working on the development of the firmware and electronics, as we want to have a working prototype by the end of… [...]

Read more

Come on and let’s rotate Aimo!

March 10, 2016

Yes, that's right, our first prototype is almost ready to be 3D printed ! Our (mechanical) engineers worked very hard to make the magic happen : For now, this is just the… [...]

Read more

Let’s talk business

March 9, 2016

We are really progressing with our device Aimo and this is partly due to our (outstanding) organization, as you were able to see it in the last post. In addition… [...]

Read more

Journey into our daily life

March 8, 2016

The spirit of CHIC is not only about designing an innovative connected device, but also rushing to be able to do it right in a very short period of 6… [...]

Read more

Time for Kick-Off!

February 22, 2016

We have been selected to go to China and we are extra motivated! We had to change our connected object Aimo a little bit because our mentors helped us realize… [...]

Read more